Српски
 Expand/Contract





   As of September 2018, all payments are made on the new current account
   of the Agency: 160-516694-54 BANCA INTESA AD Beograd


What's New

BELGRADE, Monday, October 01, 2018. - Exemption of New Natural Gas Interconnector Approved to GASTRANS

On October 1, 2018, the Council of the Energy Agency of the Republic of Serbia (AERS) has adopted a Decision on the Exemption of the New Natural Gas Interconnector thereby approving an exemption to GASTRANS d.o.o. Novi Sad from the rules on third party access on a future gas pipeline which will constructed through the Republic of Serbia and which will be connected to the Bulgarian and Hungarian national transmission systems. 


THESSALONIKI, Saturday, September 29, 2018. - Permanent Advisory Forum of the National Regulatory Authorities of the Balkan Countries Established

On September 29, national energy regulators of Bulgaria, Greece, Serbia, FYR of Macedonia and Montenegro have concluded an Agreement on the Establishment of Permanent Advisory Forum of National Regulatory Authorities of the Balkan Countries (Advisory Forum). The founding members of the Advisory Forum and Parties of this Agreement are the following national regulatory authorities: Energy and Water Regulatory Commission of the Republic of Bulgaria (EWRC), Regulatory Authority for Energy of the Republic of Greece (RAE), Energy Agency of the Republic of Serbia (AERS), Energy Regulatory Commission of the FYR of Macedonia (ERC) and the Energy Regulatory Agency of Montenegro (REGAGEN).


BELGRADE, Monday, September 24, 2018. - AERS: Reports on Necessity of Price Regulation and of Supply of the Last Resort Adopted

On the session held on September 24, 2018, in line with the provisions of the Energy Law which are harmonized with the Third Energy Package of European directives, the Council of the Energy Agency of the Republic of Serbia has adopted a Decision on the adoption of a 2018 Report on Necessity of Electricity Guaranteed Supply Price Regulation


BELGRADE, Monday, September 24, 2018. - Approval of YUGOROSGAZ-TRANSPORT Transmission System Development Plan

On the session held on September 24, 2018, the Council of the Energy Agency of the Republic of Serbia has adopted a decision on the approval of YUGOROSGAZ-TRANSPORT d.o.o. Transmission System Development Plan for the period 2018-2027. The Transmission System Operator YUGOROSGAZ-TRANSPORT d.o.o. submitted the draft of the YUGOROSGAZ-TRANSPORT d.o.o. Transmission System Development Plan for the period 2018-2027 to the Energy Agency of the Republic of Serbia in mid-May 2018. 


BELGRADE, Monday, September 03, 2018. - Decision on Rules for Capacity Allocation and Mechanisms for Transmission Capacity Operation of GASTRANS Company

On the session held on September 3, 2018, the Council of the Energy Agency of the Republic of Serbia has adopted a Decision on Rules for Capacity Allocation and Mechanisms for Transmission Capacity Operation of GASTRANS d.o.o. Novi Sad Company. This Decision has been adopted within a procedure which is carried out by the Agency in line with the Energy Law upon an application of GASTRANS for the exemption of the future gas interconnector from the third party access rules and from ownership unbundling requirements. 


BELGRADE, Tuesday, June 26, 2018. - Public Consultation: YUGOROSGAZ – TRANSPORT D.O.O. Transmission System Development Plan for 2018-2027

On 25/06/2018, the Energy Agency of the Republic of Serbia has published public consultation on the YUGOROSGAZ – TRANSPORT D.O.O. Transmission System Development Plan for the period 2018-2027 which was submitted by the natural gas transmission system operator YUGOROSGAZ – TRANSPORT D.O.O. Public consultation on this ten-year transmission system development plan is organized until 20/07/2018.


SOFIA, Tuesday, June 12, 2018. - Cooperation Agreement between Serbian and Bulgarian Regulator

The Energy Agency of the Republic of Serbia (AERS) and the Energy and Water Regulatory Commission of the Republic of Bulgaria (EWRC) has concluded an agreement on cooperation on bilateral and multilateral level in order to improve the quality of institutional and regulatory process in the energy field. The Agreement on Cooperation was signed in Sofia on June 12, by the President of the AERS Council, Dejan Popović and the Chairman of EWRC, Ivan Ivanov.


BELGRADE, Friday, May 25, 2018. - AERS adopted 2017 Annual Report

On the session held on May 25, 2018, the Council of the Energy Agency of the Republic of Serbia has adopted 2017 Annual Report and submitted it to the National Assembly. The Annual Report includes the report on the Serbian energy sector state-of-play within the Agency jurisdiction and the report on activities and financial report of the Agency.


BELGRADE, Friday, May 18, 2018. - AERS 2018 Financial Plan Adopted

the Fifth Session of the First Regular Sitting of the National Assembly of the Republic of Serbia held on May 18, 2018, the National Assembly of the Republic of Serbia has adopted a decision on the approval of the 2018 Financial Plan of the Energy Agency of the Republic of Serbia (AERS).


BELGRADE, Friday, May 04, 2018. - Ten Non-Binding Bids for Use of Future Gas Pipeline

GASTRANS, LLC, Novi Sad has informed the Energy Agency (AERS) that ten non-binding bids have been submitted during the first phase of market test for the use of future gas pipeline, which is planned to connect the Bulgarian and Hungarian transmission system via the territory of Serbia. One may assess that the level of expressed interest is at a satisfactory level. In line with the Energy Agency decision, GASTRANS will make an analysis of submitted bids by the end of June and inform the AERS on the results.


BELGRADE, Thursday, March 22, 2018. - President and Members of the Energy Agency Council Elected

On the session held on March 22, 2018, the members of the National Assembly of the Republic of Serbia have elected Dejan Popović a President of the Energy Agency (AERS) Council as a replacement of Ljubo Maćić whose term has expired. Prof Aca Marković, Dejana Stefanović-Kostić, Negica Rajakov and Goran Petković have been elected members of the AERS Council.


BELGRADE, Thursday, March 08, 2018. - GASTRANS: Expression of Interest Notice for Submission of Non-Binding Bids for Capacity Reservation

GASTRANS, LLC, Novi Sad has published expression of interest notice for the submission of non-binding bids for capacity reservation of the new gas pipeline which will go through the Republic of Serbia and connect Bulgarian and Hungarian national transmission system.

 


BELGRADE, Friday, February 09, 2018. - The Council of the Agency Adopted Decision on Method and Deadlines for Market Test on the Interest in the Use of Future Infrastructure Facility of the Company “GASTRANS”

AERS

On the session held of February 9, 2018, the Council of the Energy Agency of the Republic of Serbia has adopted a Decision on Method and Deadlines for Market Test on the Interest in the Use of Future Infrastructure Facility of the Company “GASTRANS” LLC, Novi Sad.

 

 


BELGRADE, Friday, February 02, 2018. - GASTRANS Submitted Third Party Access Exemption Application to the Energy Agency

AERS

On February 2, 2018, GASTRANS LLC, Novi Sad has submitted an application for the exemption from the third party access rules on the entire natural gas infrastructure facility – new gas pipeline which will go through the Republic of Serbia and connect Bulgarian and Hungarian national transmission system.

 


VIENNA, Tuesday, January 23, 2018. - Energy Community adopts first set of Third Energy Package Network Codes and Guidelines

The Energy Community Permanent High Level Group has adopted decisions on the adoption Network Codes and Guidelines for electricity and natural gas sectors. Network Codes and Guidelines are regulations adopted based on the Third Energy Package aimed at setting common rules on secure system operation, market integration and market functioning.


BELGRADE, Wednesday, January 17, 2018. - Assessment of Infringement of Competition Rules in the Natural Gas Market in the Republic of Serbia

On January 17, 2018, the Energy Agency of the Republic of Serbia has addressed the Commission for the Protection of Competition of the Republic of Serbia (KZK) with reference to the letters sent to the Agency by natural gas suppliers indicating that the Transmission System Operator PE Srbijagas did not provide them with the access to the Horgoš entry point on the border with Hungary.


BELGRADE, Friday, December 15, 2017. - Approval of EMS JSC Transmission Network Code

On the session held on 15/12/2017, the Council of the Energy Agency of the Republic of Serbia has adopted a decision on the approval of the Transmission Network Code of the Joint Stock Company “Elektromreža Srbije” (EMS JSC) which regulates the relations between the transmission system operator and system users.


BELGRADE, Friday, December 15, 2017. - Approval of EMS JSC Plans

On the session held on 15/12/2017, the Council of the Energy Agency of the Republic of Serbia has adopted a decision on the approval of the Transmission System Development Development Plan for 2017-2026 and Transmission System Investment Plan for 2017-2019 which were adopted by the Joint Stock Company “Elektromreža Srbije” (EMS JSC) as the transmission system operator.


BELGRADE, Thursday, December 14, 2017. - Prices of System and Ancillary Services in Power System for 2018 Set

In line with the Energy Law (“Official Gazette of RS”, No. 145/14), on December 8, 2017, the Council of the Energy Agency of the Republic of Serbia has adopted a Decision on Prices of System and Ancillary Services in the Power System for 2018.


BELGRADE, Friday, December 08, 2017. - Approval of Agreements on Cross-Border Capacity Allocation

On the session held on December 8, the Council of the Energy Agency of the Republic of Serbia has approved Agreements between the Transmission System Operator of the Republic of Serbia EMS JSC and the Transmission System Operators of Romania (Transelektrica), Macedonia (MEPSO), Hungary (MAVIR), Bulgaria (EAD), Bosnia and Herzegovina (NOSBIH) and Croatia (HOPS) on the procedure and method of cross-border capacity allocation and on access to cross-border transmission capacity for 2018.


BELGRADE, Thursday, August 31, 2017. - Approval of Decision on Price of Non-Standard Services of EMS JSC

On the session held on Thursday, August 31, 2017, the Council of the Energy Agency has approved the decision on price of non-standard services which was adopted by the Transmission System Operator “Elektromreža Srbije” JSC, Belgrade. The approved price list includes non-standard services, i.e. occasional services, i.e. those provided by the system operator upon a customer’s i.e. a system user request or services meant for removal of consequences arising from a customer’s i.e. system user’s actions against regulations which are not included in the use-of-system charges or in connection costs.


BELGRADE, Thursday, August 31, 2017. - Approval of Decision on New Electricity Guaranteed Supply Prices

On the session held on August 31, 2017, the Council of the Energy Agency of the Republic of Serbia has approvedthe Decision on Regulated Price of Guaranteed Electricity Supply which was adopted by the Acting Manager of the Public Enterprise “Elektroprivreda Srbije”. This Decision implies average electricity price increase of 2% for households and small-scale customers as of October 1, 2017.

 


BELGRADE, Thursday, July 20, 2017. - AERS: Approval of Electricity Distribution Network Code

On July 19, 2017, the Council of the Energy Agency of the Republic of Serbia has approved Decision on Approval of Electricity Distribution Network Code of the Distribution System Operator “EPS Distribucija” LLC, Belgrade which regulates relations between the Distribution System Operator (DSO) and system users.  


BELGRADE, Tuesday, June 20, 2017. - АЕRS: Independent Transmission System Operator Certificate to Yugorosgaz-transport, LLC

AERS

On the session held on June 20, 2017, in line with the Energy Law (Law) and AERS regulations, the Council of the Energy Agency of the Republic of Serbia (AERS) has adopted a Decision on the issuance of a certificate to the Yugorosgaz-transport, LLC, Niš as to an independent natural gas transmission system operator.


BELGRADE, Tuesday, June 20, 2017. - АЕRS: Approval of Metering Equipment Transfer on the Distribution System EPS Distribucija

AERS

On the session held on 20/06/2017, the Council of the Energy Agency of the Republic of Serbia has adopted a Decision on the approval of Metering Equipment Transfer Plan for the transfer of switchboards, i.e. lines, installations and equipment in the switchboards and other devices in the facilities of existing customers, i.e. producers on the distribution system which was adopted by the distribution system operator EPS Distribucija, LLC.


BELGRADE, Tuesday, June 20, 2017. - AERS: Approval of Yugorosgaz-Transport Transmission System Development Plan

AERSOn the session held on 20/06/2017, the Council of the Energy Agency of the Republic of Serbia has adopted Decision on the approval of Yugorosgaz-Transport, LLC Transmission System Development Plan for 2017-2026.


BELGRADE, Thursday, June 01, 2017. - Reports on Necessity of Electricity Price Regulation Adopted

AERS

On the session held on May 31, 2017, the Council of the Energy Agency of the Republic of Serbia (Agency) has adopted the Report on Necessity of Regulation of Price of Electricity for Guaranteed Supply for 2017, Report on Necessity of Regulation of Price of Capacity Reserve for Secondary and Tertiary Control for 2017 and the Report on Necessity of Electricity Supply of the Last Resort for 2017 (link).






WHAT'S NEW
1.10.2018 - Exemption of New Natural Gas Interconnector Approved to GASTRANS ... >> Details
29.9.2018 - Permanent Advisory Forum of the National Regulatory Authorities of the Balkan Countries Established ... >> Details
24.9.2018 - AERS: Reports on Necessity of Price Regulation and of Supply of the Last Resort Adopted ... >> Details
24.9.2018 - Approval of YUGOROSGAZ-TRANSPORT Transmission System Development Plan ... >> Details
3.9.2018 - Decision on Rules for Capacity Allocation and Mechanisms for Transmission Capacity Operation of GASTRANS Company ... >> Details
26.6.2018 - Public Consultation: YUGOROSGAZ – TRANSPORT D.O.O. Transmission System Development Plan for 2018-2027 ... >> Details
12.6.2018 - Cooperation Agreement between Serbian and Bulgarian Regulator ... >> Details
25.5.2018 - AERS adopted 2017 Annual Report ... >> Details
18.5.2018 - AERS 2018 Financial Plan Adopted ... >> Details
4.5.2018 - Ten Non-Binding Bids for Use of Future Gas Pipeline ... >> Details
22.3.2018 - President and Members of the Energy Agency Council Elected ... >> Details
8.3.2018 - GASTRANS: Expression of Interest Notice for Submission of Non-Binding Bids for Capacity Reservation ... >> Details
9.2.2018 - The Council of the Agency Adopted Decision on Method and Deadlines for Market Test on the Interest in the Use of Future Infrastructure Facility of the Company “GASTRANS” ... >> Details
2.2.2018 - GASTRANS Submitted Third Party Access Exemption Application to the Energy Agency ... >> Details
23.1.2018 - Energy Community adopts first set of Third Energy Package Network Codes and Guidelines ... >> Details
17.1.2018 - Assessment of Infringement of Competition Rules in the Natural Gas Market in the Republic of Serbia ... >> Details
15.12.2017 - Approval of EMS JSC Transmission Network Code ... >> Details
15.12.2017 - Approval of EMS JSC Plans ... >> Details
14.12.2017 - Prices of System and Ancillary Services in Power System for 2018 Set ... >> Details
8.12.2017 - Approval of Agreements on Cross-Border Capacity Allocation ... >> Details
31.8.2017 - Approval of Decision on New Electricity Guaranteed Supply Prices ... >> Details
31.8.2017 - Approval of Decision on Price of Non-Standard Services of EMS JSC ... >> Details
20.7.2017 - AERS: Approval of Electricity Distribution Network Code ... >> Details
20.6.2017 - АЕRS: Independent Transmission System Operator Certificate to Yugorosgaz-transport, LLC ... >> Details
20.6.2017 - АЕRS: Approval of Metering Equipment Transfer on the Distribution System EPS Distribucija ... >> Details
20.6.2017 - AERS: Approval of Yugorosgaz-Transport Transmission System Development Plan ... >> Details
1.6.2017 - Reports on Necessity of Electricity Price Regulation Adopted ... >> Details
18.11.2016 - Public Consultations: Methodology for Setting Natural Gas Distribution Use-of-System Charge ... >> Details
31.8.2016 - Agency Approves New Electricity Prices ... >> Details
28.7.2016 - Final Customer’s Right to Access to Data on Electricity and Natural Gas Self-Consumption ... >> Details
18.7.2016 - Approval of Decision on Prices of Non-Standard Services of “EPS Distribucija” ... >> Details
6.7.2016 - Adopted Amendments to Methodology for Setting Natural Gas Transmission Use-of-System Charge ... >> Details
1.7.2016 - Acknowledgment to Serbian Energy Agency Expert ... >> Details
23.6.2016 - Lower Crude Oil Transport Charges ... >> Details
16.6.2016 - Public Consultation – Final Customer’s Right to Access to Self-Consumption of Electricity and Natural Gas ... >> Details
10.6.2016 - Approval of Compliance Programme of the Distribution System Operator “EPS Distribucija” ... >> Details
26.2.2016 - Public Consultation on Draft Rulebook on Proceedings, Imposition of Measures and Register of Imposed Measures ... >> Details
17.2.2016 - SEEPEX Launched Serbian Day-Ahead Market Successfully ... >> Details